Real Time Impact Play
Scenes 11 min
ShinyBound

Real Time Impact Play

Cast
H3ll4SL00tzBaby Sid
Release date
Runtime
11 min
Studio
ShinyBound
Tags
BDSMBelt BondageBlonde Hair (Female)BootsCatsuitCorsetFondlingImpact PlayLeatherMuzzle GagPussy TormentSubmissive

Levi and Sid are good friends of mine that came through town for a visit. They are real life stylers and do play performances live. They are skilled and know their limits. Today they come to play for my fans!We put Baby Sid into a mesh catsuit and corset and then I secured her to a pole with leather restraints- A strict leather armbinder, wide tight leather belts around her torso and legs, and a heavy leather muzzle gag we padlocked to the top to keep her standing at attention. Also, we had stuffed her mouth with a giant sponge before the muzzle went on to ensure her cries would be silenced..Now locked and secured to the pole, Levi enters with the first of his toys.. A heavy baton. He grinds it into her chest bone as she squirms, and then whacks her on the corset and upper fronts of her thighs. She dodges and winces, but Levi's skill with hitting his mark is impressive. He begins alternating between the baton and belly punches, making sure Baby Sid is ok between blows.Next I step in and tie a crotch rope, pull it up, and anchor it to the ceiling. This keeps her positioned straight on, and she is no longer able to dodge side to side without pulling the tight rope painfully into her pussy. Levi begins again, this time with a rubber Cat of 9 Tails. Baby Sid's body is already turning bright red from all of the abuse.Last, he grabs the heavy leather paddle. He holds her by the crotchrope as he mercilessly paddles her thighs and crotch. She squeals with pain and delight, helpless to escape Levi's next move.This was the first time I had ever been a part of an impact demonstration and I was really happy that Levi and Baby Sid shared this part of themselves for my cameras. Enjoy!

My rating, notes & lists
My rating
Add to list
    Sources StashDB 2026-10-23

    Wrong information or a problem with this page? Tell us about wrong details, duplicates or illegal content.

    Report a problem

    What is wrong on this page? Every report is reviewed by the operator.

    Report a problem

    Copyright and legal requests go by email: [email protected] · DMCA